N. 95th ST (CR10) over Highland Ditch
GoodBoulder County, Colorado · 0.5 Mile North of Woodlan · Structure no. BC-19-1.5-ID1
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected January 2025
- Type
- Frame
- Concrete
- Length
- 23 ft
- 1 main span
- Daily traffic
- 1,968
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
N. 95th ST (CR10) over Highland Ditch is a concrete frame carrying N. 95th ST (CR10) over Highland Ditch in Boulder County, Colorado. It was built in 1989, so it is 36 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,968 vehicles a day, roughly 7% of them trucks, projected to reach 2,361 by 2043. The structure is 23 ft (6.9 m) long and 41 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N. 95th ST (CR10) over Highland Ditch built?
It was built in 1989, making it 36 years old in 2025.
What condition is N. 95th ST (CR10) over Highland Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does N. 95th ST (CR10) over Highland Ditch carry?
About 1,968 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is N. 95th ST (CR10) over Highland Ditch?
The structure is 23 ft (6.9 m) long with a longest span of 20 ft (6.2 m) and a deck 41 ft wide.
Who owns N. 95th ST (CR10) over Highland Ditch?
It is owned by the County Highway Agency.