Fdr 667 over East Fork San Juan River
GoodArchuleta County, Colorado · 3.4 MI on Fdr 667 · Structure no. 021306000001166
- Built
- 1969
- 56 years old, rebuilt 1995
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 72 ft
- 3 main spans
- Daily traffic
- 129
- 2003 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Fdr 667 over East Fork San Juan River is a steel continuous stringer/multi-beam or girder carrying Fdr 667 over East Fork San Juan River in Archuleta County, Colorado. It was built in 1969 and reconstructed in 1995, so it is 56 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 129 vehicles a day, roughly 10% of them trucks, projected to reach 105 by 2013. The structure is 72 ft (21.9 m) long and 26 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fdr 667 over East Fork San Juan River built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 1995.
What condition is Fdr 667 over East Fork San Juan River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Fdr 667 over East Fork San Juan River carry?
About 129 vehicles per day (2003 count), of which roughly 10% are trucks.
How long is Fdr 667 over East Fork San Juan River?
The structure is 72 ft (21.9 m) long with a longest span of 50 ft (15.3 m) and a deck 26 ft wide.
Who owns Fdr 667 over East Fork San Juan River?
It is owned by the U.S. Forest Service.