Yosemite Street over I-25 and Light Rail
FairArapahoe County, Colorado · Yosemite over I-25 · Structure no. GWDV-09-0.67-02
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 302 ft
- 4 main spans
- Daily traffic
- 10,915
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Yosemite Street over I-25 and Light Rail is a prestressed concrete continuous box beam or girders - single or spread carrying Yosemite Street over I-25 and Light Rail in Arapahoe County, Colorado. It was built in 1983, so it is 42 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.
It carries about 10,915 vehicles a day, roughly 6% of them trucks, projected to reach 13,316 by 2041. The structure is 302 ft (92.1 m) long and 79 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Yosemite Street over I-25 and Light Rail built?
It was built in 1983, making it 42 years old in 2025.
What condition is Yosemite Street over I-25 and Light Rail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Yosemite Street over I-25 and Light Rail carry?
About 10,915 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is Yosemite Street over I-25 and Light Rail?
The structure is 302 ft (92.1 m) long with a longest span of 84 ft (25.6 m) and a deck 79 ft wide.
Who owns Yosemite Street over I-25 and Light Rail?
It is owned by the City or Municipal Highway Agency.