US Bridges

US 40 Ml Wbnd over Sand Creek

Good

Arapahoe County, Colorado · 2.6 MI E of I225 · Structure no. F-17-XI

Built
2013
12 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
219 ft
3 main spans
Daily traffic
11,000
2020 count
Owner
State
State Highway Agency

About this bridge

US 40 Ml Wbnd over Sand Creek is a prestressed concrete continuous box beam or girders - multiple carrying US 40 Ml Wbnd over Sand Creek in Arapahoe County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 2% of them trucks, projected to reach 12,650 by 2040. The structure is 219 ft (66.8 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS 40 Ml Wbnd
CrossesSand Creek
Location2.6 MI E of I225
RouteU.S. Route 40C
Coordinates39.74021, -104.78111
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length219 ft (66.8 m)
Longest span90 ft (27.5 m)
Deck width56 ft (17.1 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2020)
Projected traffic12,650 by 2040
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 40 Ml Wbnd over Sand Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is US 40 Ml Wbnd over Sand Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does US 40 Ml Wbnd over Sand Creek carry?

About 11,000 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is US 40 Ml Wbnd over Sand Creek?

The structure is 219 ft (66.8 m) long with a longest span of 90 ft (27.5 m) and a deck 56 ft wide.

Who owns US 40 Ml Wbnd over Sand Creek?

It is owned by the State Highway Agency.