US Bridges

US 285 Ml over Highline Canal

Fair

Arapahoe County, Colorado · Hampden/Wellshire G.C. · Structure no. F-17-CF

Built
1960
65 years old
Condition
Fair
inspected March 2023
Type
Tee Beam
Concrete
Length
49 ft
1 main span
Daily traffic
52,000
2020 count
Owner
State
State Highway Agency

About this bridge

US 285 Ml over Highline Canal is a concrete tee beam carrying US 285 Ml over Highline Canal in Arapahoe County, Colorado. It was built in 1960, so it is 65 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 52,000 vehicles a day, roughly 3% of them trucks, projected to reach 56,680 by 2040. The structure is 49 ft (14.9 m) long and 90 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS 285 Ml
CrossesHighline Canal
LocationHampden/Wellshire G.C.
RouteU.S. Route 285D
Coordinates39.65301, -104.94639
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.7 US tons
Inventory rating45.3 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length49 ft (14.9 m)
Longest span46 ft (14 m)
Deck width90 ft (27.4 m)
Roadway width82 ft (25 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic52,000 (2020)
Projected traffic56,680 by 2040
Trucks3%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$238,000
NavigationNo navigation control on waterway

Frequently asked questions

When was US 285 Ml over Highline Canal built?

It was built in 1960, making it 65 years old in 2025.

What condition is US 285 Ml over Highline Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does US 285 Ml over Highline Canal carry?

About 52,000 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is US 285 Ml over Highline Canal?

The structure is 49 ft (14.9 m) long with a longest span of 46 ft (14 m) and a deck 90 ft wide.

Who owns US 285 Ml over Highline Canal?

It is owned by the State Highway Agency.