US Bridges

Peakview Avenue over Cottonwood Creek

Fair

Arapahoe County, Colorado · .1 MI W of Lima ST · Structure no. CENT 40.9-10.7

Built
1984
41 years old
Condition
Fair
inspected October 2023
Type
Tee Beam
Prestressed Concrete
Length
118 ft
2 main spans
Daily traffic
4,487
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Peakview Avenue over Cottonwood Creek is a prestressed concrete tee beam carrying Peakview Avenue over Cottonwood Creek in Arapahoe County, Colorado. It was built in 1984, so it is 41 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,487 vehicles a day, roughly 2% of them trucks, projected to reach 5,474 by 2041. The structure is 118 ft (36 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPeakview Avenue
CrossesCottonwood Creek
Location.1 MI W of Lima ST
RouteCity Street 0
Coordinates39.59736, -104.85851
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.4 US tons
Inventory rating53.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length118 ft (36 m)
Longest span56 ft (17.1 m)
Deck width74 ft (22.6 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,487 (2021)
Projected traffic5,474 by 2041
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peakview Avenue over Cottonwood Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is Peakview Avenue over Cottonwood Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Peakview Avenue over Cottonwood Creek carry?

About 4,487 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Peakview Avenue over Cottonwood Creek?

The structure is 118 ft (36 m) long with a longest span of 56 ft (17.1 m) and a deck 74 ft wide.

Who owns Peakview Avenue over Cottonwood Creek?

It is owned by the City or Municipal Highway Agency.