US Bridges

Mission Pkwy over Meadowood Creek

Fair

Arapahoe County, Colorado · At N End of Alicia Park · Structure no. AUR17.5-K.3

Built
1974
51 years old
Condition
Fair
inspected October 2023
Type
Arch - Deck
Steel
Length
26 ft
1 main span
Daily traffic
1,640
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mission Pkwy over Meadowood Creek is a steel arch - deck carrying Mission Pkwy over Meadowood Creek in Arapahoe County, Colorado. It was built in 1974, so it is 51 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,640 vehicles a day, roughly 2% of them trucks, projected to reach 2,001 by 2041. The structure is 26 ft (8 m) long and 119 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMission Pkwy
CrossesMeadowood Creek
LocationAt N End of Alicia Park
RouteCity Street 0
Coordinates39.64929, -104.79836
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.1 US tons
Inventory rating54.5 US tons

Structure

Structure typeArch - Deck
MaterialSteel
DeckNot applicable
Main spans1
Design loadHS 20
Structure length26 ft (8 m)
Longest span26 ft (8 m)
Deck width119 ft (36.4 m)
Roadway width64 ft (19.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,640 (2021)
Projected traffic2,001 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mission Pkwy over Meadowood Creek built?

It was built in 1974, making it 51 years old in 2025.

What condition is Mission Pkwy over Meadowood Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Mission Pkwy over Meadowood Creek carry?

About 1,640 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Mission Pkwy over Meadowood Creek?

The structure is 26 ft (8 m) long with a longest span of 26 ft (8 m) and a deck 119 ft wide.

Who owns Mission Pkwy over Meadowood Creek?

It is owned by the City or Municipal Highway Agency.