County RD 217 over First Creek
FairArapahoe County, Colorado · 2.2 MI N of CR 34 · Structure no. ARA 217-6.1
- Built
- 1950
- 75 years old, rebuilt 2004
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 40 ft
- 2 main spans
- Daily traffic
- 174
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 217 over First Creek is a steel continuous stringer/multi-beam or girder carrying County RD 217 over First Creek in Arapahoe County, Colorado. It was built in 1950 and reconstructed in 2004, so it is 75 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 174 vehicles a day, roughly 1% of them trucks, projected to reach 212 by 2041. The structure is 40 ft (12.3 m) long and 35 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 217 over First Creek built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 2004.
What condition is County RD 217 over First Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County RD 217 over First Creek carry?
About 174 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is County RD 217 over First Creek?
The structure is 40 ft (12.3 m) long with a longest span of 19 ft (5.9 m) and a deck 35 ft wide.
Who owns County RD 217 over First Creek?
It is owned by the County Highway Agency.