144th Ave over East Frontage RD
GoodAdams County, Colorado · 0.1 MI E of I-25 · Structure no. THN-144WAS-EFR
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected January 2024
- Type
- Arch - Deck
- Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 23,906
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
144th Ave over East Frontage RD is a concrete arch - deck carrying 144th Ave over East Frontage RD in Adams County, Colorado. It was built in 2006, so it is 19 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 23,906 vehicles a day, roughly 6% of them trucks, projected to reach 31,077 by 2041. The structure is 52 ft (15.9 m) long and 177 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 144th Ave over East Frontage RD built?
It was built in 2006, making it 19 years old in 2025.
What condition is 144th Ave over East Frontage RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does 144th Ave over East Frontage RD carry?
About 23,906 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is 144th Ave over East Frontage RD?
The structure is 52 ft (15.9 m) long with a longest span of 48 ft (14.7 m) and a deck 177 ft wide.
Who owns 144th Ave over East Frontage RD?
It is owned by the City or Municipal Highway Agency.