US Bridges

E-470 Ramp F over I25 Nwp

Good

Adams County, Colorado · SB I25 to SB E470 · Structure no. E-470-46.39D

Built
2003
22 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
803 ft
4 main spans
Daily traffic
6,600
2018 count
Owner
Toll Authority
Local Toll Authority

About this bridge

E-470 Ramp F over I25 Nwp is a steel continuous stringer/multi-beam or girder carrying E-470 Ramp F over I25 Nwp in Adams County, Colorado. It was built in 2003, so it is 22 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,600 vehicles a day, roughly 6% of them trucks, projected to reach 6,800 by 2025. The structure is 803 ft (244.9 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE-470 Ramp F
CrossesI25 Nwp
LocationSB I25 to SB E470
Coordinates39.98089, -104.98664
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.4 US tons
Inventory rating36.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length803 ft (244.9 m)
Longest span227 ft (69.3 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck18 ft (5.5 m)

Traffic and service

Average daily traffic6,600 (2018)
Projected traffic6,800 by 2025
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E-470 Ramp F over I25 Nwp built?

It was built in 2003, making it 22 years old in 2025.

What condition is E-470 Ramp F over I25 Nwp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does E-470 Ramp F over I25 Nwp carry?

About 6,600 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is E-470 Ramp F over I25 Nwp?

The structure is 803 ft (244.9 m) long with a longest span of 227 ft (69.3 m) and a deck 43 ft wide.

Who owns E-470 Ramp F over I25 Nwp?

It is owned by the Local Toll Authority.