I 25 Ml over 62nd Ave
FairAdams County, Colorado · 0.6 MI So of JCT I-76 · Structure no. E-17-OW
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 169 ft
- 3 main spans
- Daily traffic
- 196,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml over 62nd Ave is a prestressed concrete continuous box beam or girders - single or spread carrying I 25 Ml over 62nd Ave in Adams County, Colorado. It was built in 1993, so it is 32 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 196,000 vehicles a day, roughly 10% of them trucks, projected to reach 229,320 by 2040. The structure is 169 ft (51.4 m) long and 245 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml over 62nd Ave built?
It was built in 1993, making it 32 years old in 2025.
What condition is I 25 Ml over 62nd Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I 25 Ml over 62nd Ave carry?
About 196,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is I 25 Ml over 62nd Ave?
The structure is 169 ft (51.4 m) long with a longest span of 87 ft (26.5 m) and a deck 245 ft wide.
Who owns I 25 Ml over 62nd Ave?
It is owned by the State Highway Agency.