US Bridges

WB Montview Blvd over Westerly Creek

Good

Adams County, Colorado · 0.26 MI E of Yosemite · Structure no. AUR04.0-A.5

Built
2014
11 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
72 ft
1 main span
Daily traffic
10,906
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

WB Montview Blvd over Westerly Creek is a prestressed concrete box beam or girders - multiple carrying WB Montview Blvd over Westerly Creek in Adams County, Colorado. It was built in 2014, so it is 11 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,906 vehicles a day, roughly 10% of them trucks, projected to reach 14,177 by 2041. The structure is 72 ft (21.9 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB Montview Blvd
CrossesWesterly Creek
Location0.26 MI E of Yosemite
RouteCity Street 0
Coordinates39.74744, -104.87994
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.7 US tons
Inventory rating26.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length72 ft (21.9 m)
Longest span60 ft (18.3 m)
Deck width42 ft (12.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,906 (2021)
Projected traffic14,177 by 2041
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was WB Montview Blvd over Westerly Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is WB Montview Blvd over Westerly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does WB Montview Blvd over Westerly Creek carry?

About 10,906 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is WB Montview Blvd over Westerly Creek?

The structure is 72 ft (21.9 m) long with a longest span of 60 ft (18.3 m) and a deck 42 ft wide.

Who owns WB Montview Blvd over Westerly Creek?

It is owned by the City or Municipal Highway Agency.