US Bridges

Peoria Street over Baranmor Ditch

Fair

Adams County, Colorado · Peoria and Baranmor Pkwy · Structure no. AUR01.9-E.0

Built
2014
11 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
34 ft
2 main spans
Daily traffic
25,984
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Peoria Street over Baranmor Ditch is a concrete culvert carrying Peoria Street over Baranmor Ditch in Adams County, Colorado. It was built in 2014, so it is 11 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,984 vehicles a day, roughly 20% of them trucks, projected to reach 33,779 by 2041. The structure is 34 ft (10.4 m) long and 371 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPeoria Street
CrossesBaranmor Ditch
LocationPeoria and Baranmor Pkwy
RouteCounty Highway 0
Coordinates39.76243, -104.84682
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.2 US tons
Inventory rating46.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length34 ft (10.4 m)
Longest span16 ft (4.9 m)
Deck width371 ft (113.2 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,984 (2021)
Projected traffic33,779 by 2041
Trucks20%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peoria Street over Baranmor Ditch built?

It was built in 2014, making it 11 years old in 2025.

What condition is Peoria Street over Baranmor Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Peoria Street over Baranmor Ditch carry?

About 25,984 vehicles per day (2021 count), of which roughly 20% are trucks.

How long is Peoria Street over Baranmor Ditch?

The structure is 34 ft (10.4 m) long with a longest span of 16 ft (4.9 m) and a deck 371 ft wide.

Who owns Peoria Street over Baranmor Ditch?

It is owned by the City or Municipal Highway Agency.