Hard Money Road over San Arroyo Creek
FairAdams County, Colorado · 0.8 MI S of 168th Avenue · Structure no. ADA64N-160.8091
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 66 ft
- 1 main span
- Daily traffic
- 24
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Hard Money Road over San Arroyo Creek is a steel stringer/multi-beam or girder carrying Hard Money Road over San Arroyo Creek in Adams County, Colorado. It was built in 1978, so it is 47 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24 vehicles a day, projected to reach 32 by 2041. The structure is 66 ft (20.1 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hard Money Road over San Arroyo Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is Hard Money Road over San Arroyo Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Hard Money Road over San Arroyo Creek carry?
About 24 vehicles per day (2021 count).
How long is Hard Money Road over San Arroyo Creek?
The structure is 66 ft (20.1 m) long with a longest span of 63 ft (19.2 m) and a deck 30 ft wide.
Who owns Hard Money Road over San Arroyo Creek?
It is owned by the County Highway Agency.