US Bridges

Cameron Drive over Brighton Lateral

Fair

Adams County, Colorado · 0.8 MI North of 120th Ave · Structure no. ADA13N-124.0086

Built
1994
31 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
117
2021 count
Owner
County
County Highway Agency

About this bridge

Cameron Drive over Brighton Lateral is a steel stringer/multi-beam or girder carrying Cameron Drive over Brighton Lateral in Adams County, Colorado. It was built in 1994, so it is 31 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 117 vehicles a day, projected to reach 152 by 2041. The structure is 40 ft (12.3 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCameron Drive
CrossesBrighton Lateral
Location0.8 MI North of 120th Ave
RouteCounty Highway 0
Coordinates39.92288, -104.80451
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.8 US tons
Inventory rating28.5 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadUnknown
Structure length40 ft (12.3 m)
Longest span38 ft (11.6 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic117 (2021)
Projected traffic152 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cameron Drive over Brighton Lateral built?

It was built in 1994, making it 31 years old in 2025.

What condition is Cameron Drive over Brighton Lateral in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Cameron Drive over Brighton Lateral carry?

About 117 vehicles per day (2021 count).

How long is Cameron Drive over Brighton Lateral?

The structure is 40 ft (12.3 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.

Who owns Cameron Drive over Brighton Lateral?

It is owned by the County Highway Agency.