US Bridges

Gavin Mandry Drive over Dry Creek

Good

Yuba County, California · 2.2 Miles East of Interse · Structure no. AFCABAEY03114

Built
2022
3 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Single or Spread
Concrete
Length
100 ft
1 main span
Daily traffic
200
2022 count
Owner
Federal
Air Force

About this bridge

Gavin Mandry Drive over Dry Creek is a concrete box beam or girders - single or spread carrying Gavin Mandry Drive over Dry Creek in Yuba County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, projected to reach 220 by 2032. The structure is 100 ft (30.5 m) long and 35 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesGavin Mandry Drive
CrossesDry Creek
Location2.2 Miles East of Interse
Coordinates39.10001, -121.35098
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span94 ft (28.5 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic220 by 2032
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerAir Force
Maintained byAir Force
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$23,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Gavin Mandry Drive over Dry Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Gavin Mandry Drive over Dry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Gavin Mandry Drive over Dry Creek carry?

About 200 vehicles per day (2022 count).

How long is Gavin Mandry Drive over Dry Creek?

The structure is 100 ft (30.5 m) long with a longest span of 94 ft (28.5 m) and a deck 35 ft wide.

Who owns Gavin Mandry Drive over Dry Creek?

It is owned by the Air Force.