Los Verjeles RD over South Honcut Creek
FairPosted for loadYuba County, California · At Butte County Line · Structure no. 16C0026
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected July 2023
- Type
- Arch - Deck
- Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 730
- 2007 count
- Owner
- County
- County Highway Agency
About this bridge
Los Verjeles RD over South Honcut Creek is a concrete arch - deck carrying Los Verjeles RD over South Honcut Creek in Yuba County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 730 vehicles a day, roughly 10% of them trucks, projected to reach 1,091 by 2045. The structure is 58 ft (17.7 m) long and 20 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Los Verjeles RD over South Honcut Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is Los Verjeles RD over South Honcut Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Los Verjeles RD over South Honcut Creek carry?
About 730 vehicles per day (2007 count), of which roughly 10% are trucks.
How long is Los Verjeles RD over South Honcut Creek?
The structure is 58 ft (17.7 m) long with a longest span of 56 ft (17.1 m) and a deck 20 ft wide.
Who owns Los Verjeles RD over South Honcut Creek?
It is owned by the County Highway Agency.