US Bridges

Interstate 80 over Bike & Pedestrian Tunnel

Fair

Yolo County, California · 03-YOL-080-0.01-DVS · Structure no. 22 0194

Built
2001
24 years old
Condition
Fair
inspected May 2023
Type
Box Beam or Girders - Multiple
Concrete
Length
57 ft
1 main span
Daily traffic
128,000
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 80 over Bike & Pedestrian Tunnel is a concrete box beam or girders - multiple carrying Interstate 80 over Bike & Pedestrian Tunnel in Yolo County, California. It was built in 2001, so it is 24 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 128,000 vehicles a day, roughly 10% of them trucks, projected to reach 199,000 by 2040. The structure is 57 ft (17.4 m) long and 152 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesInterstate 80
CrossesBike & Pedestrian Tunnel
Location03-YOL-080-0.01-DVS
RouteInterstate 80
Coordinates38.53774, -121.73879
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length57 ft (17.4 m)
Longest span56 ft (17.1 m)
Deck width152 ft (46.3 m)
Roadway width146 ft (44.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic128,000 (2015)
Projected traffic199,000 by 2040
Trucks10%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 80 over Bike & Pedestrian Tunnel built?

It was built in 2001, making it 24 years old in 2025.

What condition is Interstate 80 over Bike & Pedestrian Tunnel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Interstate 80 over Bike & Pedestrian Tunnel carry?

About 128,000 vehicles per day (2015 count), of which roughly 10% are trucks.

How long is Interstate 80 over Bike & Pedestrian Tunnel?

The structure is 57 ft (17.4 m) long with a longest span of 56 ft (17.1 m) and a deck 152 ft wide.

Who owns Interstate 80 over Bike & Pedestrian Tunnel?

It is owned by the State Highway Agency.