Channel Islands DR over Long Grade Canyon Creek
GoodVentura County, California · 0.05 MI N Anacapa Island · Structure no. 52I0004
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected August 2022
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 700
- 2022 count
- Owner
- State
- Other State Agency
About this bridge
Channel Islands DR over Long Grade Canyon Creek is a concrete box beam or girders - multiple carrying Channel Islands DR over Long Grade Canyon Creek in Ventura County, California. It was built in 2006, so it is 19 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 700 vehicles a day, roughly 1% of them trucks, projected to reach 1,030 by 2040. The structure is 47 ft (14.3 m) long and 53 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Channel Islands DR over Long Grade Canyon Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is Channel Islands DR over Long Grade Canyon Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.
How much traffic does Channel Islands DR over Long Grade Canyon Creek carry?
About 700 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Channel Islands DR over Long Grade Canyon Creek?
The structure is 47 ft (14.3 m) long with a longest span of 44 ft (13.5 m) and a deck 53 ft wide.
Who owns Channel Islands DR over Long Grade Canyon Creek?
It is owned by the Other State Agency.