Matilija RD over North Fork Matilija Crk
FairVentura County, California · 0.01 MI S of State RTE 33 · Structure no. 52C0201
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected June 2024
- Type
- Arch - Deck
- Concrete
- Length
- 109 ft
- 1 main span
- Daily traffic
- 50
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Matilija RD over North Fork Matilija Crk is a concrete arch - deck carrying Matilija RD over North Fork Matilija Crk in Ventura County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 120 by 2042. The structure is 109 ft (33.2 m) long and 30 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Matilija RD over North Fork Matilija Crk built?
It was built in 1940, making it 85 years old in 2025.
What condition is Matilija RD over North Fork Matilija Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Matilija RD over North Fork Matilija Crk carry?
About 50 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Matilija RD over North Fork Matilija Crk?
The structure is 109 ft (33.2 m) long with a longest span of 75 ft (22.9 m) and a deck 30 ft wide.
Who owns Matilija RD over North Fork Matilija Crk?
It is owned by the County Highway Agency.