Piru Canyon Road over Reasoner Creek
FairVentura County, California · 7.1 MI N Center Str. · Structure no. 52C0174
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 42 ft
- 1 main span
- Daily traffic
- 700
- 2019 count
- Owner
- Local
- Other Local Agency
About this bridge
Piru Canyon Road over Reasoner Creek is a steel stringer/multi-beam or girder carrying Piru Canyon Road over Reasoner Creek in Ventura County, California. It was built in 1955, so it is 70 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 700 vehicles a day, roughly 1% of them trucks, projected to reach 1,424 by 2046. The structure is 42 ft (12.8 m) long and 24 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Piru Canyon Road over Reasoner Creek built?
It was built in 1955, making it 70 years old in 2025.
What condition is Piru Canyon Road over Reasoner Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Piru Canyon Road over Reasoner Creek carry?
About 700 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Piru Canyon Road over Reasoner Creek?
The structure is 42 ft (12.8 m) long with a longest span of 39 ft (11.9 m) and a deck 24 ft wide.
Who owns Piru Canyon Road over Reasoner Creek?
It is owned by the Other Local Agency.