US Bridges

Rosewood Ave over Camarillo Hills Drain

Good

Ventura County, California · 0.1 MI S Ponderosa DR · Structure no. 52C0114

Built
1970
55 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
28 ft
1 main span
Daily traffic
4,000
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Rosewood Ave over Camarillo Hills Drain is a concrete culvert carrying Rosewood Ave over Camarillo Hills Drain in Ventura County, California. It was built in 1970, so it is 55 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,000 vehicles a day, roughly 1% of them trucks, projected to reach 4,190 by 2044. The structure is 28 ft (8.5 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRosewood Ave
CrossesCamarillo Hills Drain
Location0.1 MI S Ponderosa DR
RouteCity Street 0
Coordinates34.22333, -119.06133
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span26 ft (7.9 m)
Deck width73 ft (22.3 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,000 (2022)
Projected traffic4,190 by 2044
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rosewood Ave over Camarillo Hills Drain built?

It was built in 1970, making it 55 years old in 2025.

What condition is Rosewood Ave over Camarillo Hills Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Rosewood Ave over Camarillo Hills Drain carry?

About 4,000 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Rosewood Ave over Camarillo Hills Drain?

The structure is 28 ft (8.5 m) long with a longest span of 26 ft (7.9 m) and a deck 73 ft wide.

Who owns Rosewood Ave over Camarillo Hills Drain?

It is owned by the City or Municipal Highway Agency.