Harbor Blvd over Arundell Barranca
FairVentura County, California · 1.0 MI S Seaward Ave · Structure no. 52C0018R
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete Continuous
- Length
- 62 ft
- 3 main spans
- Daily traffic
- 9,342
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Harbor Blvd over Arundell Barranca is a concrete continuous slab carrying Harbor Blvd over Arundell Barranca in Ventura County, California. It was built in 1959, so it is 66 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,342 vehicles a day, roughly 1% of them trucks, projected to reach 12,178 by 2040. The structure is 62 ft (18.9 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Harbor Blvd over Arundell Barranca built?
It was built in 1959, making it 66 years old in 2025.
What condition is Harbor Blvd over Arundell Barranca in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Harbor Blvd over Arundell Barranca carry?
About 9,342 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Harbor Blvd over Arundell Barranca?
The structure is 62 ft (18.9 m) long with a longest span of 24 ft (7.3 m) and a deck 46 ft wide.
Who owns Harbor Blvd over Arundell Barranca?
It is owned by the City or Municipal Highway Agency.