Route 118 EB over Kuehner DR
FairVentura County, California · 07-VEN-118-R30.52-SIMV · Structure no. 52 0282
- Built
- 1968
- 57 years old, rebuilt 2006
- Condition
- Fair
- inspected February 2025
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 165 ft
- 3 main spans
- Daily traffic
- 126,000
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Route 118 EB over Kuehner DR is a concrete continuous box beam or girders - multiple carrying Route 118 EB over Kuehner DR in Ventura County, California. It was built in 1968 and reconstructed in 2006, so it is 57 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 126,000 vehicles a day, roughly 4% of them trucks, projected to reach 151,168 by 2047. The structure is 165 ft (50.4 m) long and 144 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 118 EB over Kuehner DR built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2006.
What condition is Route 118 EB over Kuehner DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Route 118 EB over Kuehner DR carry?
About 126,000 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is Route 118 EB over Kuehner DR?
The structure is 165 ft (50.4 m) long with a longest span of 90 ft (27.3 m) and a deck 144 ft wide.
Who owns Route 118 EB over Kuehner DR?
It is owned by the State Highway Agency.