Main Road over District #2 Canal
FairVentura County, California · Nbvc Point Mugu · Structure no. 1CA0141
- Built
- 1948
- 77 years old, rebuilt 1960
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 90 ft
- 4 main spans
- Daily traffic
- 200
- 2013 count
- Owner
- Federal
- Navy / Marines
About this bridge
Main Road over District #2 Canal is a concrete box beam or girders - multiple carrying Main Road over District #2 Canal in Ventura County, California. It was built in 1948 and reconstructed in 1960, so it is 77 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 250 by 2042. The structure is 90 ft (27.4 m) long and 52 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main Road over District #2 Canal built?
It was built in 1948, making it 77 years old in 2025. It was reconstructed in 1960.
What condition is Main Road over District #2 Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Main Road over District #2 Canal carry?
About 200 vehicles per day (2013 count), of which roughly 2% are trucks.
How long is Main Road over District #2 Canal?
The structure is 90 ft (27.4 m) long with a longest span of 23 ft (6.9 m) and a deck 52 ft wide.
Who owns Main Road over District #2 Canal?
It is owned by the Navy / Marines.