C.G. Road over N. Fork Matilija
FairVentura County, California · Wheeler Gorge C.G. · Structure no. 050755000001004
- Built
- 1953
- 72 years old, rebuilt 1994
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 50
- Owner
- Federal
- U.S. Forest Service
About this bridge
C.G. Road over N. Fork Matilija is a steel stringer/multi-beam or girder carrying C.G. Road over N. Fork Matilija in Ventura County, California. It was built in 1953 and reconstructed in 1994, so it is 72 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 34 ft (10.4 m) long and 16 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C.G. Road over N. Fork Matilija built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1994.
What condition is C.G. Road over N. Fork Matilija in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does C.G. Road over N. Fork Matilija carry?
About 50 vehicles per day (latest count).
How long is C.G. Road over N. Fork Matilija?
The structure is 34 ft (10.4 m) long with a longest span of 33 ft (10.1 m) and a deck 16 ft wide.
Who owns C.G. Road over N. Fork Matilija?
It is owned by the U.S. Forest Service.