Bear Creek Road over Rancheria Creek

Good

Tulare County, California · 3.4 MI E of Balch Park RD · Structure no. 46C0470

Built
2019
6 years old
Condition
Good
inspected February 2023
Type
Slab
Prestressed Concrete
Length
72 ft
1 main span
Daily traffic
30
2016 count
Owner
County
County Highway Agency

About this bridge

Bear Creek Road over Rancheria Creek is a prestressed concrete slab carrying Bear Creek Road over Rancheria Creek in Tulare County, California. It was built in 2019, so it is 6 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, roughly 2% of them trucks, projected to reach 42 by 2043. The structure is 72 ft (22 m) long and 30 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesBear Creek Road
CrossesRancheria Creek
Location3.4 MI E of Balch Park RD
RouteCounty Highway 0
Coordinates36.22, -118.76421
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length72 ft (22 m)
Longest span68 ft (20.6 m)
Deck width30 ft (9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2016)
Projected traffic42 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bear Creek Road over Rancheria Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Bear Creek Road over Rancheria Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Bear Creek Road over Rancheria Creek carry?

About 30 vehicles per day (2016 count), of which roughly 2% are trucks.

How long is Bear Creek Road over Rancheria Creek?

The structure is 72 ft (22 m) long with a longest span of 68 ft (20.6 m) and a deck 30 ft wide.

Who owns Bear Creek Road over Rancheria Creek?

It is owned by the County Highway Agency.