Visalia Parkway over Packwood Creek
GoodTulare County, California · At County Center DR · Structure no. 46C0466
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected January 2022
- Type
- Culvert
- Concrete Continuous
- Length
- 27 ft
- 2 main spans
- Daily traffic
- 4,366
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Visalia Parkway over Packwood Creek is a concrete continuous culvert carrying Visalia Parkway over Packwood Creek in Tulare County, California. It was built in 2015, so it is 10 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,366 vehicles a day, roughly 5% of them trucks, projected to reach 5,309 by 2044. The structure is 27 ft (8.1 m) long and 110 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 9 Excellent | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Visalia Parkway over Packwood Creek built?
It was built in 2015, making it 10 years old in 2025.
What condition is Visalia Parkway over Packwood Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.
How much traffic does Visalia Parkway over Packwood Creek carry?
About 4,366 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Visalia Parkway over Packwood Creek?
The structure is 27 ft (8.1 m) long with a longest span of 12 ft (3.7 m) and a deck 110 ft wide.
Who owns Visalia Parkway over Packwood Creek?
It is owned by the City or Municipal Highway Agency.