US Bridges

Ave 152 (olive St) over State Route 99

Good

Tulare County, California · 06-TUL-099-19.46-TIP · Structure no. 46 0280

Built
2022
3 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
196 ft
2 main spans
Daily traffic
1,400
2022 count
Owner
State
State Highway Agency

About this bridge

Ave 152 (olive St) over State Route 99 is a prestressed concrete continuous box beam or girders - single or spread carrying Ave 152 (olive St) over State Route 99 in Tulare County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,400 vehicles a day, roughly 30% of them trucks, projected to reach 1,800 by 2042. The structure is 196 ft (59.8 m) long and 52 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesAve 152 (olive St)
CrossesState Route 99
Location06-TUL-099-19.46-TIP
RouteCity Street 0Z381
Coordinates36.06593, -119.31453
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length196 ft (59.8 m)
Longest span95 ft (29.1 m)
Deck width52 ft (15.8 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2022)
Projected traffic1,800 by 2042
Trucks30%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ave 152 (olive St) over State Route 99 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Ave 152 (olive St) over State Route 99 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Ave 152 (olive St) over State Route 99 carry?

About 1,400 vehicles per day (2022 count), of which roughly 30% are trucks.

How long is Ave 152 (olive St) over State Route 99?

The structure is 196 ft (59.8 m) long with a longest span of 95 ft (29.1 m) and a deck 52 ft wide.

Who owns Ave 152 (olive St) over State Route 99?

It is owned by the State Highway Agency.