Canyon Creek Road over Clear Gulch
FairTrinity County, California · 1.4 MI NE SR 299 JCT City · Structure no. 05C0166
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 24 ft
- 1 main span
- Daily traffic
- 75
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Canyon Creek Road over Clear Gulch is a steel stringer/multi-beam or girder carrying Canyon Creek Road over Clear Gulch in Trinity County, California. It was built in 1955, so it is 70 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 3% of them trucks, projected to reach 81 by 2042. The structure is 24 ft (7.3 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Canyon Creek Road over Clear Gulch built?
It was built in 1955, making it 70 years old in 2025.
What condition is Canyon Creek Road over Clear Gulch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Canyon Creek Road over Clear Gulch carry?
About 75 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is Canyon Creek Road over Clear Gulch?
The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.7 m) and a deck 28 ft wide.
Who owns Canyon Creek Road over Clear Gulch?
It is owned by the County Highway Agency.