Pacific Avenue over Eastside Drainage Canal
FairSutter County, California · 1/2 MI S Catlett RD · Structure no. 18C0092
- Built
- 1935
- 90 years old, rebuilt 1960
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 271 ft
- 16 main spans
- Daily traffic
- 269
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Pacific Avenue over Eastside Drainage Canal is a concrete stringer/multi-beam or girder carrying Pacific Avenue over Eastside Drainage Canal in Sutter County, California. It was built in 1935 and reconstructed in 1960, so it is 90 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 269 vehicles a day, roughly 8% of them trucks, projected to reach 555 by 2046. The structure is 271 ft (82.6 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pacific Avenue over Eastside Drainage Canal built?
It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1960.
What condition is Pacific Avenue over Eastside Drainage Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Pacific Avenue over Eastside Drainage Canal carry?
About 269 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Pacific Avenue over Eastside Drainage Canal?
The structure is 271 ft (82.6 m) long with a longest span of 17 ft (5.2 m) and a deck 32 ft wide.
Who owns Pacific Avenue over Eastside Drainage Canal?
It is owned by the County Highway Agency.