Hickman Road over Tuolumne River
GoodStanislaus County, California · 0.15 MI S State Route 132 · Structure no. 38C0346
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 752 ft
- 5 main spans
- Daily traffic
- 6,441
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Hickman Road over Tuolumne River is a prestressed concrete continuous box beam or girders - multiple carrying Hickman Road over Tuolumne River in Stanislaus County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,441 vehicles a day, roughly 15% of them trucks, projected to reach 8,326 by 2043. The structure is 752 ft (229.3 m) long and 49 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hickman Road over Tuolumne River built?
It was built in 2021, making it 4 years old in 2025.
What condition is Hickman Road over Tuolumne River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Hickman Road over Tuolumne River carry?
About 6,441 vehicles per day (2016 count), of which roughly 15% are trucks.
How long is Hickman Road over Tuolumne River?
The structure is 752 ft (229.3 m) long with a longest span of 170 ft (51.8 m) and a deck 49 ft wide.
Who owns Hickman Road over Tuolumne River?
It is owned by the County Highway Agency.