Church Street over M.I.D. Lateral #2
FairStanislaus County, California · 1 MI N/O SR 132 · Structure no. 38C0286
- Built
- 1920
- 105 years old, rebuilt 1960
- Condition
- Fair
- inspected November 2024
- Type
- Slab
- Concrete Continuous
- Length
- 23 ft
- 2 main spans
- Daily traffic
- 3,678
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Church Street over M.I.D. Lateral #2 is a concrete continuous slab carrying Church Street over M.I.D. Lateral #2 in Stanislaus County, California. It was built in 1920 and reconstructed in 1960, so it is 105 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,678 vehicles a day, roughly 12% of them trucks, projected to reach 4,197 by 2044. The structure is 23 ft (7 m) long and 37 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Church Street over M.I.D. Lateral #2 built?
It was built in 1920, making it 105 years old in 2025. It was reconstructed in 1960.
What condition is Church Street over M.I.D. Lateral #2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Church Street over M.I.D. Lateral #2 carry?
About 3,678 vehicles per day (2016 count), of which roughly 12% are trucks.
How long is Church Street over M.I.D. Lateral #2?
The structure is 23 ft (7 m) long with a longest span of 11 ft (3.4 m) and a deck 37 ft wide.
Who owns Church Street over M.I.D. Lateral #2?
It is owned by the County Highway Agency.