Stark Road over Westley Wasteway
GoodStanislaus County, California · 0.7 MI S Howard RD · Structure no. 38C0187
- Built
- 1930
- 95 years old
- Condition
- Good
- inspected August 2024
- Type
- Tee Beam
- Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 158
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Stark Road over Westley Wasteway is a concrete tee beam carrying Stark Road over Westley Wasteway in Stanislaus County, California. It was built in 1930, so it is 95 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 158 vehicles a day, roughly 32% of them trucks, projected to reach 313 by 2042. The structure is 51 ft (15.5 m) long and 29 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stark Road over Westley Wasteway built?
It was built in 1930, making it 95 years old in 2025.
What condition is Stark Road over Westley Wasteway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Stark Road over Westley Wasteway carry?
About 158 vehicles per day (2018 count), of which roughly 32% are trucks.
How long is Stark Road over Westley Wasteway?
The structure is 51 ft (15.5 m) long with a longest span of 49 ft (14.9 m) and a deck 29 ft wide.
Who owns Stark Road over Westley Wasteway?
It is owned by the County Highway Agency.