US Bridges

Rose Avenue over M.I.D. Lateral #3

Fair

Stanislaus County, California · At Briggsmore Ave · Structure no. 38C0136

Built
1977
48 years old
Condition
Fair
inspected February 2022
Type
Culvert
Concrete
Length
25 ft
3 main spans
Daily traffic
9,650
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Rose Avenue over M.I.D. Lateral #3 is a concrete culvert carrying Rose Avenue over M.I.D. Lateral #3 in Stanislaus County, California. It was built in 1977, so it is 48 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,650 vehicles a day, roughly 5% of them trucks, projected to reach 12,512 by 2044. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRose Avenue
CrossesM.I.D. Lateral #3
LocationAt Briggsmore Ave
RouteCity Street 0
Coordinates37.66716, -120.96619
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,650 (2011)
Projected traffic12,512 by 2044
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rose Avenue over M.I.D. Lateral #3 built?

It was built in 1977, making it 48 years old in 2025.

What condition is Rose Avenue over M.I.D. Lateral #3 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2022.

How much traffic does Rose Avenue over M.I.D. Lateral #3 carry?

About 9,650 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is Rose Avenue over M.I.D. Lateral #3?

The structure is 25 ft (7.6 m) long with a longest span of 8 ft (2.4 m).

Who owns Rose Avenue over M.I.D. Lateral #3?

It is owned by the City or Municipal Highway Agency.