Finney Road over M.I.D. Lateral #6
FairStanislaus County, California · 0.3 MI N Murphy/Bacon RD · Structure no. 38C0108
- Built
- 1922
- 103 years old, rebuilt 1990
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 1,165
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Finney Road over M.I.D. Lateral #6 is a concrete continuous slab carrying Finney Road over M.I.D. Lateral #6 in Stanislaus County, California. It was built in 1922 and reconstructed in 1990, so it is 103 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,165 vehicles a day, roughly 18% of them trucks, projected to reach 1,353 by 2044. The structure is 24 ft (7.3 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Finney Road over M.I.D. Lateral #6 built?
It was built in 1922, making it 103 years old in 2025. It was reconstructed in 1990.
What condition is Finney Road over M.I.D. Lateral #6 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Finney Road over M.I.D. Lateral #6 carry?
About 1,165 vehicles per day (2018 count), of which roughly 18% are trucks.
How long is Finney Road over M.I.D. Lateral #6?
The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.4 m) and a deck 52 ft wide.
Who owns Finney Road over M.I.D. Lateral #6?
It is owned by the County Highway Agency.