Albers Road over M.I.D. Main Canal
FairStanislaus County, California · 0.9 MI N State Route 132 · Structure no. 38C0049
- Built
- 1925
- 100 years old, rebuilt 1959
- Condition
- Fair
- inspected January 2025
- Type
- Tee Beam
- Concrete Continuous
- Length
- 67 ft
- 4 main spans
- Daily traffic
- 11,776
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Albers Road over M.I.D. Main Canal is a concrete continuous tee beam carrying Albers Road over M.I.D. Main Canal in Stanislaus County, California. It was built in 1925 and reconstructed in 1959, so it is 100 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,776 vehicles a day, roughly 28% of them trucks, projected to reach 13,085 by 2043. The structure is 67 ft (20.4 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Albers Road over M.I.D. Main Canal built?
It was built in 1925, making it 100 years old in 2025. It was reconstructed in 1959.
What condition is Albers Road over M.I.D. Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Albers Road over M.I.D. Main Canal carry?
About 11,776 vehicles per day (2019 count), of which roughly 28% are trucks.
How long is Albers Road over M.I.D. Main Canal?
The structure is 67 ft (20.4 m) long with a longest span of 16 ft (5 m) and a deck 42 ft wide.
Who owns Albers Road over M.I.D. Main Canal?
It is owned by the County Highway Agency.