Pacific Avenue over Hillside
FairSonoma County, California · In Jenner · Structure no. 20C0589
- Built
- 2015
- 10 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 38 ft
- 2 main spans
- Daily traffic
- 100
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
Pacific Avenue over Hillside is a steel stringer/multi-beam or girder carrying Pacific Avenue over Hillside in Sonoma County, California. It was built in 2015, so it is 10 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, projected to reach 106 by 2046. The structure is 38 ft (11.6 m) long and 11 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pacific Avenue over Hillside built?
It was built in 2015, making it 10 years old in 2025.
What condition is Pacific Avenue over Hillside in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Pacific Avenue over Hillside carry?
About 100 vehicles per day (2011 count).
How long is Pacific Avenue over Hillside?
The structure is 38 ft (11.6 m) long with a longest span of 18 ft (5.5 m) and a deck 11 ft wide.
Who owns Pacific Avenue over Hillside?
It is owned by the County Highway Agency.