US Bridges

Stwrt Pt-Skgg Sprg over Hillside

Fair

Sonoma County, California · 8.5 MI E/O SR 1 · Structure no. 20C0552

Built
2011
14 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
3 main spans
Daily traffic
300
2015 count
Owner
County
County Highway Agency

About this bridge

Stwrt Pt-Skgg Sprg over Hillside is a steel stringer/multi-beam or girder carrying Stwrt Pt-Skgg Sprg over Hillside in Sonoma County, California. It was built in 2011, so it is 14 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 300 vehicles a day, roughly 4% of them trucks, projected to reach 367 by 2040. The structure is 60 ft (18.3 m) long and 10 ft wide. If it were closed, the detour would be 24.2 mi (39 km).

CarriesStwrt Pt-Skgg Sprg
CrossesHillside
Location8.5 MI E/O SR 1
RouteCounty Highway 0
Coordinates38.678, -123.285
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.5 US tons
Inventory rating40.3 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans3
Design loadHS 20 + Mod
Structure length60 ft (18.3 m)
Longest span20 ft (6.1 m)
Deck width10 ft (3.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2015)
Projected traffic367 by 2040
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed24.2 mi (39 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Stwrt Pt-Skgg Sprg over Hillside built?

It was built in 2011, making it 14 years old in 2025.

What condition is Stwrt Pt-Skgg Sprg over Hillside in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Stwrt Pt-Skgg Sprg over Hillside carry?

About 300 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is Stwrt Pt-Skgg Sprg over Hillside?

The structure is 60 ft (18.3 m) long with a longest span of 20 ft (6.1 m) and a deck 10 ft wide.

Who owns Stwrt Pt-Skgg Sprg over Hillside?

It is owned by the County Highway Agency.