US Bridges

S101-W12 Connector over Olive Street

Fair

Sonoma County, California · 04-SON-101-19.82-SRO · Structure no. 20 0205F

Built
1964
61 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
151 ft
3 main spans
Daily traffic
6,300
2016 count
Owner
State
State Highway Agency

About this bridge

S101-W12 Connector over Olive Street is a concrete continuous box beam or girders - multiple carrying S101-W12 Connector over Olive Street in Sonoma County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,300 vehicles a day, roughly 4% of them trucks, projected to reach 11,221 by 2046. The structure is 151 ft (46 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS101-W12 Connector
CrossesOlive Street
Location04-SON-101-19.82-SRO
RouteU.S. Route 101
Coordinates38.43292, -122.71917
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating28.2 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length151 ft (46 m)
Longest span66 ft (20.1 m)
Deck width27 ft (8.1 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,300 (2016)
Projected traffic11,221 by 2046
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S101-W12 Connector over Olive Street built?

It was built in 1964, making it 61 years old in 2025.

What condition is S101-W12 Connector over Olive Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does S101-W12 Connector over Olive Street carry?

About 6,300 vehicles per day (2016 count), of which roughly 4% are trucks.

How long is S101-W12 Connector over Olive Street?

The structure is 151 ft (46 m) long with a longest span of 66 ft (20.1 m) and a deck 27 ft wide.

Who owns S101-W12 Connector over Olive Street?

It is owned by the State Highway Agency.