US Bridges

Clyde Jean Place over Unnamed Wetlands

Fair

Solano County, California · 100 Ft W/O Plye Ct · Structure no. 23C0291

Built
2017
8 years old
Condition
Fair
inspected December 2023
Type
Arch - Deck
Concrete
Length
45 ft
1 main span
Daily traffic
100
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Clyde Jean Place over Unnamed Wetlands is a concrete arch - deck carrying Clyde Jean Place over Unnamed Wetlands in Solano County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 158 by 2045. The structure is 45 ft (13.8 m) long and 84 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesClyde Jean Place
CrossesUnnamed Wetlands
Location100 Ft W/O Plye Ct
RouteCity Street 0
Coordinates38.29668, -121.98321
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length45 ft (13.8 m)
Longest span45 ft (13.8 m)
Deck width84 ft (25.6 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic158 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Clyde Jean Place over Unnamed Wetlands built?

It was built in 2017, making it 8 years old in 2025.

What condition is Clyde Jean Place over Unnamed Wetlands in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Clyde Jean Place over Unnamed Wetlands carry?

About 100 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Clyde Jean Place over Unnamed Wetlands?

The structure is 45 ft (13.8 m) long with a longest span of 45 ft (13.8 m) and a deck 84 ft wide.

Who owns Clyde Jean Place over Unnamed Wetlands?

It is owned by the City or Municipal Highway Agency.