Airport RD over Central Marks Channel
GoodSolano County, California · N. of Church Street · Structure no. 23C0268
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected March 2021
- Type
- Slab
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 1,000
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Airport RD over Central Marks Channel is a prestressed concrete slab carrying Airport RD over Central Marks Channel in Solano County, California. It was built in 2009, so it is 16 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,000 vehicles a day, roughly 3% of them trucks, projected to reach 2,054 by 2038. The structure is 40 ft (12.2 m) long and 75 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Airport RD over Central Marks Channel built?
It was built in 2009, making it 16 years old in 2025.
What condition is Airport RD over Central Marks Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2021.
How much traffic does Airport RD over Central Marks Channel carry?
About 1,000 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is Airport RD over Central Marks Channel?
The structure is 40 ft (12.2 m) long with a longest span of 35 ft (10.8 m) and a deck 75 ft wide.
Who owns Airport RD over Central Marks Channel?
It is owned by the City or Municipal Highway Agency.