Mc Cormack Road over The Big Ditch
FairSolano County, California · 0.2 MI E RTE 113 · Structure no. 23C0255
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 75
- 2004 count
- Owner
- County
- County Highway Agency
About this bridge
Mc Cormack Road over The Big Ditch is a concrete slab carrying Mc Cormack Road over The Big Ditch in Solano County, California. It was built in 2003, so it is 22 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 2% of them trucks, projected to reach 109 by 2041. The structure is 41 ft (12.5 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mc Cormack Road over The Big Ditch built?
It was built in 2003, making it 22 years old in 2025.
What condition is Mc Cormack Road over The Big Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Mc Cormack Road over The Big Ditch carry?
About 75 vehicles per day (2004 count), of which roughly 2% are trucks.
How long is Mc Cormack Road over The Big Ditch?
The structure is 41 ft (12.5 m) long with a longest span of 41 ft (12.5 m) and a deck 31 ft wide.
Who owns Mc Cormack Road over The Big Ditch?
It is owned by the County Highway Agency.