US Bridges

Eubanks DR over Kilkenny Canal

Fair

Solano County, California · At Aldridge Road · Structure no. 23C0239M

Built
1979
46 years old
Condition
Fair
inspected October 2024
Type
Tee Beam
Prestressed Concrete
Length
27 ft
1 main span
Daily traffic
3,020
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Eubanks DR over Kilkenny Canal is a prestressed concrete tee beam carrying Eubanks DR over Kilkenny Canal in Solano County, California. It was built in 1979, so it is 46 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,020 vehicles a day, roughly 15% of them trucks, projected to reach 4,401 by 2042. The structure is 27 ft (8.2 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEubanks DR
CrossesKilkenny Canal
LocationAt Aldridge Road
RouteCity Street 0
Coordinates38.40047, -121.95953
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length27 ft (8.2 m)
Longest span26 ft (7.9 m)
Deck width49 ft (14.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,020 (2012)
Projected traffic4,401 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Eubanks DR over Kilkenny Canal built?

It was built in 1979, making it 46 years old in 2025.

What condition is Eubanks DR over Kilkenny Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Eubanks DR over Kilkenny Canal carry?

About 3,020 vehicles per day (2012 count), of which roughly 15% are trucks.

How long is Eubanks DR over Kilkenny Canal?

The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.9 m) and a deck 49 ft wide.

Who owns Eubanks DR over Kilkenny Canal?

It is owned by the City or Municipal Highway Agency.