US Bridges

Allendale RD over Putah South Canal

Good

Solano County, California · 0.4 MI W North Locke RD · Structure no. 23C0162

Built
1955
70 years old
Condition
Good
inspected October 2024
Type
Slab
Concrete
Length
51 ft
2 main spans
Daily traffic
895
2011 count
Owner
County
County Highway Agency

About this bridge

Allendale RD over Putah South Canal is a concrete slab carrying Allendale RD over Putah South Canal in Solano County, California. It was built in 1955, so it is 70 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 895 vehicles a day, roughly 4% of them trucks, projected to reach 1,110 by 2042. The structure is 51 ft (15.5 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesAllendale RD
CrossesPutah South Canal
Location0.4 MI W North Locke RD
RouteCounty Highway 0
Coordinates38.45319, -121.95515
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating28.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length51 ft (15.5 m)
Longest span25 ft (7.6 m)
Deck width29 ft (8.8 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic895 (2011)
Projected traffic1,110 by 2042
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Allendale RD over Putah South Canal built?

It was built in 1955, making it 70 years old in 2025.

What condition is Allendale RD over Putah South Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Allendale RD over Putah South Canal carry?

About 895 vehicles per day (2011 count), of which roughly 4% are trucks.

How long is Allendale RD over Putah South Canal?

The structure is 51 ft (15.5 m) long with a longest span of 25 ft (7.6 m) and a deck 29 ft wide.

Who owns Allendale RD over Putah South Canal?

It is owned by the County Highway Agency.