E80-N113 Connector over South Fork Putah Creek
GoodSolano County, California · 04-SOL-080-42.37 · Structure no. 23 0054G
- Built
- 1974
- 51 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 572 ft
- 6 main spans
- Daily traffic
- 9,900
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
E80-N113 Connector over South Fork Putah Creek is a concrete continuous box beam or girders - multiple carrying E80-N113 Connector over South Fork Putah Creek in Solano County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,900 vehicles a day, roughly 2% of them trucks, projected to reach 12,911 by 2042. The structure is 572 ft (174.4 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E80-N113 Connector over South Fork Putah Creek built?
It was built in 1974, making it 51 years old in 2025.
What condition is E80-N113 Connector over South Fork Putah Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does E80-N113 Connector over South Fork Putah Creek carry?
About 9,900 vehicles per day (2012 count), of which roughly 2% are trucks.
How long is E80-N113 Connector over South Fork Putah Creek?
The structure is 572 ft (174.4 m) long with a longest span of 104 ft (31.7 m) and a deck 42 ft wide.
Who owns E80-N113 Connector over South Fork Putah Creek?
It is owned by the State Highway Agency.