Main ST CR S500 over Downie River
FairSierra County, California · In Downieville · Structure no. 13C0055
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 133 ft
- 1 main span
- Daily traffic
- 150
- 1998 count
- Owner
- County
- County Highway Agency
About this bridge
Main ST CR S500 over Downie River is a prestressed concrete box beam or girders - single or spread carrying Main ST CR S500 over Downie River in Sierra County, California. It was built in 1986, so it is 39 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 2% of them trucks, projected to reach 207 by 2041. The structure is 133 ft (40.4 m) long and 15 ft wide. If it were closed, the detour would be 24.2 mi (39 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST CR S500 over Downie River built?
It was built in 1986, making it 39 years old in 2025.
What condition is Main ST CR S500 over Downie River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Main ST CR S500 over Downie River carry?
About 150 vehicles per day (1998 count), of which roughly 2% are trucks.
How long is Main ST CR S500 over Downie River?
The structure is 133 ft (40.4 m) long with a longest span of 130 ft (39.6 m) and a deck 15 ft wide.
Who owns Main ST CR S500 over Downie River?
It is owned by the County Highway Agency.