Lemon Canyon Road over Lemon Creek
FairSierra County, California · 1.4 MI E of SR 49 Nr Sie · Structure no. 13C0042
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected August 2023
- Type
- Tee Beam
- Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 25
- 1998 count
- Owner
- County
- County Highway Agency
About this bridge
Lemon Canyon Road over Lemon Creek is a concrete tee beam carrying Lemon Canyon Road over Lemon Creek in Sierra County, California. It was built in 1965, so it is 60 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 52 by 2041. The structure is 47 ft (14.3 m) long and 24 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lemon Canyon Road over Lemon Creek built?
It was built in 1965, making it 60 years old in 2025.
What condition is Lemon Canyon Road over Lemon Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Lemon Canyon Road over Lemon Creek carry?
About 25 vehicles per day (1998 count), of which roughly 10% are trucks.
How long is Lemon Canyon Road over Lemon Creek?
The structure is 47 ft (14.3 m) long with a longest span of 42 ft (12.9 m) and a deck 24 ft wide.
Who owns Lemon Canyon Road over Lemon Creek?
It is owned by the County Highway Agency.