US Bridges

Sharon Ave over A.C.I.D Canal

Good

Shasta County, California · 300 N/W Russell ST · Structure no. 06C0391

Built
2022
3 years old
Condition
Good
inspected March 2024
Type
Slab
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
200
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sharon Ave over A.C.I.D Canal is a prestressed concrete slab carrying Sharon Ave over A.C.I.D Canal in Shasta County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 1% of them trucks, projected to reach 267 by 2044. The structure is 55 ft (16.7 m) long and 29 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSharon Ave
CrossesA.C.I.D Canal
Location300 N/W Russell ST
RouteCity Street 0
Coordinates40.56857, -122.38134
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length55 ft (16.7 m)
Longest span53 ft (16.1 m)
Deck width29 ft (8.8 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2012)
Projected traffic267 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sharon Ave over A.C.I.D Canal built?

It was built in 2022, making it 3 years old in 2025.

What condition is Sharon Ave over A.C.I.D Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Sharon Ave over A.C.I.D Canal carry?

About 200 vehicles per day (2012 count), of which roughly 1% are trucks.

How long is Sharon Ave over A.C.I.D Canal?

The structure is 55 ft (16.7 m) long with a longest span of 53 ft (16.1 m) and a deck 29 ft wide.

Who owns Sharon Ave over A.C.I.D Canal?

It is owned by the City or Municipal Highway Agency.