Soquel DR over Aptos Creek
FairSanta Cruz County, California · At Spreckles DR · Structure no. 36C0075
- Built
- 1928
- 97 years old
- Condition
- Fair
- inspected September 2023
- Type
- Arch - Deck
- Concrete
- Length
- 249 ft
- 1 main span
- Daily traffic
- 14,600
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Soquel DR over Aptos Creek is a concrete arch - deck carrying Soquel DR over Aptos Creek in Santa Cruz County, California. It was built in 1928, so it is 97 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,600 vehicles a day, roughly 10% of them trucks, projected to reach 15,915 by 2041. The structure is 249 ft (76 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Soquel DR over Aptos Creek built?
It was built in 1928, making it 97 years old in 2025.
What condition is Soquel DR over Aptos Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Soquel DR over Aptos Creek carry?
About 14,600 vehicles per day (2016 count), of which roughly 10% are trucks.
How long is Soquel DR over Aptos Creek?
The structure is 249 ft (76 m) long with a longest span of 135 ft (41.1 m) and a deck 33 ft wide.
Who owns Soquel DR over Aptos Creek?
It is owned by the County Highway Agency.